Abstract

In this paper, the flow shop resource allocation scheduling with learning effect and position-dependent weights on two-machine no-wait setting is considered. Under common due date assignment and slack due date assignment rules, a bi-criteria analysis is provided. The optimality properties and polynomial time algorithms are developed to solve four versions of the problem. For a special case of the problem, it is proved that the problem can be optimally solved by a lower order algorithm.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.