Abstract

Motivated by a real-life scheduling problem in a steel wire factory in China,this paper considers the single machine scheduling problem with sequence-dependent family setup times to minimize maximum lateness. In view of the NP-hard nature of the problem, structural (dominance and neighbourhood)properties of the problem are described and used in the tabu search algorithms to find optimal or near-optimal schedules. These proposed structural properties quickly exclude unpromising and/or non-improving neighbours from further search.Empirical results on the randomly generated and real-life problem instances from a factory in China show that the proposed heuristic algorithms utilizing the structural properties can obtain optimal or near optimal solutions with a reasonable computational effort.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.