Abstract
In many real-life scheduling environments, the jobs deteriorate at a certain rate while waiting to be processed. This paper addresses some single-machine scheduling problems with past-sequence-dependent (p-s-d) delivery times and a linear deterioration. The p-s-d delivery time of a job is proportional to the job's waiting time. It is assumed that the deterioration process is reflected in the jobprocessing times being an increasing function of their starting times. We consider the following objectives: the makespan, total completion time, total weighted completion time, maximum lateness, and total absolute differences in completion times. We seek the optimal schedules for the problems to minimize the makespan and total completion time.Despite that the computational complexities of the problems tominimize the total weighted completion time and maximum lateness remain open, we present heuristics and analyze their worst-case performance ratios, and show that some special cases of the problems are polynomially solvable. We also show that the optimal schedule for the problem to minimize the total absolute differences in completion times is $V$-shaped with respect to the normal job processing times.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Journal of Industrial & Management Optimization
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.