Abstract

This paper studies the single-job lot streaming problem in a two-stage hybrid flowshop that has m identical machines at the first stage and one machine at the second stage, to minimise the makespan. A setup time is considered before processing each sublot on a machine. For the problem with the number of sublots given, we prove that it is optimal to use a rotation method for allocating and sequencing the sublots on the machines. With such allocation and sequencing, the sublot sizes are then optimised using linear programming. We then consider the problem with equal sublot sizes and develop an efficient solution to determining the optimal number of sublots. Finally optimal and heuristic solution methods for the general problem are proposed and the worst-case performance of the equal-sublot solution is analysed. Computational results are also reported demonstrating the close-to-optimal performances of the heuristic methods in different problem settings.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.