Abstract

The simultaneous problem of scheduling and optimization of operational conditions in multistage multiproduct continuous plants with intermediate storage is addressed. An MINLP model, named TSPFLOW that is based on the TSP formulation for product sequencing, is proposed to schedule the operation of such plants. TSPFLOW yields one order of magnitude CPU time reduction as well as the solution of instances larger than the ones formerly reported (Pinto and Grossmann, 1994). Secondly, processing rates and yields are introduced as additional optimization variables in order to state the simultaneous problem of scheduling with operational optimization. Results show that trade-offs are very complex and there is no straightforward method (“rule of thumb”) in order to optimally schedule the operation.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.