Abstract

This paper addresses the problem of the simultaneous scheduling and optimization of the operating conditions of continuous multistage multiproduct plants with intermediate storage. First, an MINLP model, called TSPFLOW, that is based on the TSP formulation for product sequencing is proposed for the scheduling of the operation of such plants. TSPFLOW leads to a significant reduction in the number of constraints and continuous and binary variables from a formulation previously reported (Pinto, J. M.; Grossmann, I. E. Comput. Chem. Eng. 1994, 18, 797) and, consequently, a one-order-of-magnitude reduction in CPU time. Moreover, TSPFLOW solves instances two times as large as those formerly reported. Second, production rates and yields are introduced as additional optimization variables to state the simultaneous problem of scheduling with operational optimization. A linearization approach that employs the discretization of nonlinear variables is presented and compared to the direct solution of the original MINL...

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.