Abstract

Increasing demand for customized products in the wake of the 4th Industrial Revolution is placing ever increasing demands on the flexibility of manufacturing systems. Furthermore, the increasing usage of automated guided vehicles (AGV) adds another layer of flexibility and also complexity to the overall production system. The resulting Flexible Job Shop Scheduling Problem (FJSSP), including the coordination of the AGVs, is NP-hard and therefore hard to optimize. To address this problem, a Reinforcement Learning Multi Agent (MARL) system is proposed, in which job scheduling and vehicle planning is done cooperatively. This concept is described and prototypically implemented.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call