Abstract

To improve the operational efficiency of automated container terminals and the coordination between multiple operations, this article studies the integrated scheduling optimization problem of automated guided vehicles (AGVs) and yard cranes. The impact of charging constraints on AGV task allocation and scheduling is considered. With the goal of minimizing the maximum completion time of all tasks, a mixed integer programming model is proposed. A solution method based on a dynamic programming algorithm is designed, where a heuristic algorithm is used to assign tasks to the yard cranes, and the dynamic programming method is used to assign tasks to the AGVs based on the task assignment results of the yard cranes. Finally, the validity of the model and algorithm is tested by numerical experiments. Furthermore, the influence of the quantity of AGVs on the terminal operational efficiency and the impact of AGV charging strategies on AGV scheduling are analysed.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.