Abstract
A dynamic sequencing method has been developed that can simultaneously optimize the final pit and the production schedule of an open-pit coal mine. The method first establishes a geological seam model of a bedded coal deposit which estimates the relevant attributes of coal seams at the center of each block on the X-Y plane. Based on the seam model, a sequence of “geologically optimum final pits” is generated and, in each of these pits, a sequence of “geologically optimum push-backs” is generated. The geologically optimum push-backs are then put into a dynamic programming scheme and the best production schedule which has the highest NPV is obtained for each final pit. After the best production schedules for all the final pits are obtained, the one with the highest overall NPV is the optimum final pit and its associated best schedule is the overall best production schedule.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.