Abstract
Our study points on a small groundwater well field of Arad City (Romania). We built in EPANET a model of the Mandruloc groundwater well field (13 wells). Due to the metering of the consumers, the demand dropped, so the well field is working at partial loads. We simulated the operation of the well field, by stopping 3 and 6 successive wells, placed at different positions. To avoid the wells overcharge, calculations were performed assuming that pumps run at variable speed. The proposed pumping algorithm gives better results with respect to a previous solution with orifice plates.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.