Abstract

PurposeThe purpose of this paper is to present the simulation model for manpower planning in electrical maintenance service facility and evaluates different scenarios to improve resource utilization while meeting the desired service level.Design/methodology/approachThe process systematically maps entire system of electrical fault rectification, identifies probability distributions of demand of electrical maintenance requests and its process times using historical data. The simulation software Arena was used to model the entire system and various possible improvements were evaluated to assess performance of maintenance service facility.FindingsThe simulation results obtained for the proposed changes in the system indicated the potential improvement in resource utilization while meeting the average waiting time expectations of customers.Practical implicationsThe proposed simulation model can help maintenance people to decide the optimum number of resources to meet the agreed performance level that is expected by various stakeholders.Originality/valueThe paper considers the computer simulation in modeling complex real-life system for understanding the resource requirement of electrical fault maintenance facility to improve resource utilization while meeting the desired service level.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.