Abstract
As the power output of the photovoltaic (PV) cell changes with the insolation changing, PV cell temperature and cell voltage changing, it is necessary to control the operating voltage to draw the maximum power of the PV cell in order to increase system efficiency. Two-level three phase grid-connected PV system is designed. The forestage BOOST chopper adopt Incremental conductance algorithm to implement Maximum Power Point Tracking; The controller for the inverter system contains inner current loop and external voltage loop. According to the proposed control schemes, the phase and frequency of grid-connected current is the same as grid voltage, with the result of unity of the power, factor for power grid. The PV grid-connected system is built by MATLAB/SIMULINK, and the simulation results show that the proposed control schemes are validated.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.