Abstract
The 500kV power grid is the most important high-power AC power system in China. The 500kV transformer is responsible for the regular uploading and sending tasks. It is important electrical primary equipment that connects two or even three different voltage levels. Taking a new 500kV transformer in Chongqing as an example, this paper discusses the influencing factors of 500kV transformer inrush current when connected to the grid through PSCAD/EMTDC software, and puts forward feasible measures to suppress the inrush current.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have