Abstract
The scheduling of a suspension bridge construction project is very influential in determining the success of construction which has risks and uncertainties in the construction of a suspension bridge. So we need a suspension bridge project scheduling to predict the work schedule for each suspension bridge construction activity. To overcome all the risks and uncertainties in the construction of a suspension bridge, a Monte Carlo method simulation is needed to process 10 activities in a suspension bridge construction project. The accuracy rate using Monte Carlo simulation is 93.99% for predictions for 2017, 2018 for 98.77% and 86.75% for 2019. So this Monte Carlo simulation can be used in predicting the scheduling of a suspension bridge construction project.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.