Abstract

Energy Storage Systems (ESS) could be widely available in power systems, in which case the short-term scheduling is one of the essential problems that need to be addressed. This paper presents a resources scheduling method for the optimal operation plan with the energy storage systems, which utilizes the Mixed Integer Programming (MIP) based on the branch and bound method. The proposed method is evaluated on two case studies. One study examines a daily optimal operational plan for power supply resources and energy storage systems in an isolated micro-grid system. Another examines the optimal operational plan in a conventional power system with a large-scale energy storage system.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.