Abstract

The Beijing-Tianjin inter-city rail line is the first 350 km/h high-speed railway in China using all Bogle slab tracks that require a post-construction settlement of less than 15mm. The data from monitoring soil stress and settlement characteristics of different parts of the CFG composite pile foundation shows that the stress is large and changes rapidly on the top of stakes in the period of construction and precompaction. Analysis of the data using hyperbola and Hushino methods indicates that 70% of the settlement from preloading occurs in 40 days and forecasts that the settlement of subgrade after acceptance satisfies the requirements of Code.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.