Abstract

In the world of economy, the return of an investment is very important. Businesses want it to be long-term when preparing projects for investment purposes. Before the economic analysis of a project can be completed, the uncertainty of its values must be clarified. In this study, how much improvement is calculated by adding high efficiency engine and heat exchanger, which are two different projects. It has been determined how much savings the systems provide in the change of energy costs in a given year with these renewal additions. This determined energy saving was graphically plotted and sensitivity analysis was made.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.