Abstract

Field measurements of settlement and lateral deformation obtained from three deep excavation sites constructed in mixed ground profiles are presented and analyzed. Settlement measurements were obtained throughout the construction process, categorized in three stages as: (1) preexcavation (i.e., preliminary site work and support wall installation); (2) main excavation and bracing/anchor installation; and (3) postexcavation (i.e., removal of bracing as basement construction proceeds). Maximum preexcavation stage settlements of 0.03% Hw to 0.06% Hw (where Hw =wall or trench depth) were measured at two sites, with the maximum settlements occurring adjacent to the wall during its installation. Maximum ground surface settlements during the main excavation stage ranged from about 0.15% He to 0.30% He (where He =final excavation depth) and the distribution of ground settlement extended to a distance of 1.5 He to 2.0 He from the wall. Maximum settlements occurred at distances of about 0.3 He to 0.5 He from the wal...

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.