Abstract

This paper provides a self-healing strategy to deal with catastrophic events when power system vulnerability analysis indicates that the system is approaching an extreme emergency state. In the authors' approach, the system is adaptively divided into smaller islands with consideration of quick restoration. Then, a load shedding scheme based on the rate of frequency decline is applied. The proposed scheme is tested on a 179-bus, 20-generator sample system and shows very good performance.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.