Abstract

The hybrid coupled shear wall (HCW) with replaceable coupling beam (CB) is an optimal component to recover buildings promptly after a severe earthquake. However, the reinstallation may be difficult or impossible with an identical CB because of the inelastic relative dislocation between two wall piers. This study proposes a novel HCW with different reinforcement ratios in the connection, which was tested under cyclic loading. After the test, the bolt holes can be located through terrestrial scanning, which is then utilized to fabricate a new CB that can accommodate the deformation between two wall piers. The newly replaced HCW system was also tested. As a result, all virgin test specimens fail in web fracture and show a significant inelastic chord rotation of 0.2 rad, exhibiting an excellent energy dissipation capacity. Meanwhile, the new method to locate the bolt holes after the test is feasible. The replaced HCW fails in the pull-off of anchor bars and shows poor seismic behavior due to the unpatched concrete cover in the connection. To improve the energy dissipation for the replaced HCW, high-strength grouting in the connection can be used and high-strength material can be used to replace the usual anchor bolts.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.