Abstract

Dongming Yellow River Highway Bridge is an important super large bridge across the Yellow River on national highway 106. In order to effectively improve the cracking and deflection of the bridge, the cable-stayed system is used to reinforce the main girder of the project. In order to analyze the stress state of joist, bracket and box girder, the static loading of cable is carried out through scale model test to study the mechanical properties of concrete box girder segment, joist and bracket, verify the reliability of bracket and concrete box girder anchorage, and optimize the reinforcement method of cable-stayed system according to the test results.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.