Abstract
We consider a scheduling problem in a factory producing printed circuit boards (PCBs). The PCB assembly process in this factory can be regarded as a flowshop which has two special characteristics: jobs have sequence dependent setup times and each job consists of a lot (batch) of identical PCBs. Because of the latter characteristic, it is possible to start a job on a following machine before the job is entirely completed on a previous machine, that is, there is time-lag between machines. In this paper, we propose several heuristics, including taboo search (TS) and simulated annealing (SA) methods, for this generalized flowshop scheduling problem with the objective of minimizing mean tardiness. We compare suggested heuristics after series of tests to find appropriate values for parameters needed for the two search algorithms, TS and SA. Results of computational tests on randomly generated test problems are reported.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.