Abstract

1. Justification of the design and construction of the Krasnoyarsk station required a broad range of scientific investigations. Organization of the investigations and adoption of the results for improving reliability of the installations and improving the engineering economic indices of the station were possible through the close cooperation of design and construction engineers, scientists, and operational personnel. 2. A considerable part of the results of the investigations is of importance not only for the Krasnoyarsk station, but also for several large hydropower installations under construction, in the design stage, and scheduled for future construction. 3. Krasnoyarsk hydroelectric station, the largest in the world, embracing the experience gained in hydropower construction in the USSR, was and continues to be one of the main experimental bases of Soviet hydraulic engineering science.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call