Abstract

The sequential production of identical jobs and the flow-shop machine setting are extremely common in real-life applications. We study a scheduling problem that combines these two elements: jobs of identical processing time, with job-dependent weights, and a given common due date processed on an m-machine flow-shop. The (just-in-time) objective is to minimize the maximum earliness/tardiness cost. We introduce a polynomial time solution in both cases of (i) a non-restrictive (ie, sufficiently large) due date, and (ii) a restrictive due date (which restricts the number of early jobs).

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.