Abstract

We address a batch scheduling problem of n identical processing time jobs on an m-machine flow-shop and a 2-machine job-shop. The objective is makespan minimization. Both problems are shown to be solved in O(n).

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.