Abstract

This paper addresses the problem of open shop scheduling on two machines with resources constraints. In the context of our study, in order to be executed, a job requires first, for its preparation for a given period of time, a number of resources which cannot exceed a given resource capacity. Then, it goes onto its execution while the resources allocated to it become available again. We seek a schedule that minimizes the makespan. We first prove the $\mathcal{N}\mathcal{P}$ -hardness of several versions of this problem. Then, we present a well solvable case, lower bounds, and heuristic algorithms along with an experimental study.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.