Abstract
We discuss the harvesting of a single forest block from an operations scheduling viewpoint. We report on a harvesting case study, based on practical data from a commercial enterprise, involving minimum and maximum time lags and resource constraints. It appears that the scheduling of the harvesting forest blocks is a significantly different scenario from those represented by the scheduling models available in the literature. The differences come about because: the duration of each operation is dependent upon the combination of constrained resources allocated to it, individual worker-equipment allocation is restricted, and minimum or maximum time lags can be imposed. We report on harvesting operations, a scheduling model, and solution procedures, designed specifically for the case study.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.