Abstract
Here we examine an active redundant system with scheduled starting times of the units. We assume availability of n non-identical, non-repairable units for replacement or support. The original unit starts its operation at time s 1 = 0 and each one of the ( n − 1) standbys starts its operation at scheduled time s i ( i = 2, …, n) and works in parallel with those already introduced and not failed before s i . The system is up at times s i ( i = 2, …, n), if and only if, there is at least one unit in operation. Thus, the system has the possibility to work with up to n units, in parallel structure. Unit-lifetimes T i ( i = 1, …, n) are independent with cdf F i , respectively. The system has to operate without inspection for a fixed period of time c and it stops functioning when all available units fail before c. The probability that the system is functioning for the required period of time c depends on the distribution of the unit-lifetimes and on the scheduling of the starting times s i . The reliability of the system is evaluated via a recursive relation as a function of the starting times s i ( i = 2, …, n). Maximizing with respect to the starting times we get the optimal ones. Analytical results are presented for some special distributions and moderate values of n.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have