Abstract
In this paper, a single-machine scheduling model with a given common due date and simple linear processing times was considered. The objective is the total weighted tardiness penalty and earliness award. Some polynomial time solvable cases for this problem are given. A dynamic programming algorithm was provided and a branch and bound algorithm for general case of the problem was provided based on a rapid method for estimating the lower bound.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have