Abstract

In this paper, a single-machine scheduling model with a given common due date is considered. Job processing time is a linear decreasing function of its starting time. The objective function is to minimize the total weighted earliness award and tardiness penalty. Our aim is to find an optimal schedule so as to minimize the objective function. As the problem is NP-hard, some properties and polynomial time solvable cases of this problem are given. A dynamic programming algorithm for the general case of the problem is provided.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call