Abstract
In this paper, we address the problem of scheduling jobs on identical machines for minimising the maximum completion time (makespan). Each job requires a sequence-independent setup time, which represents the time needed to prepare the machines for job execution. Then, we introduce a dynamic programme to solve the case with two machines, and show that this problem admits a fully polynomial time approximation scheme. For the case of m machines, we propose heuristics and an adapted genetic algorithm. Some numerical experiments are done to evaluate the proposed algorithms.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.