Abstract

We consider a multiobjective scheduling problem, with the aim of minimizing the maximum lateness and the makespan on identical machines, when the number of machines is fixed. This paper proposes an exact algorithm (based on a dynamic programming) to generate the complete Pareto Frontier in a pseudo-polynomial time. Moreover, four heuristics have been proposed in order to optimize our algorithm. Then, we present a Polynomial Time Approximation Scheme (PTAS) to generate an approximate Pareto Frontier. In this scheme, we use a simplification technique based on the merging of jobs. Furthermore, we present a Fully Polynomial Time Approximation Scheme (FPTAS) to generate an approximate Pareto Frontier, based on the conversion of the dynamic programming algorithm. The proposed FPTAS is strongly polynomial. Finally, some numerical experiments are provided in order to compare the proposed approaches.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.