Abstract

In this paper we consider the problem of scheduling jobs with release dates on parallel unbounded batch processing machines to minimize the maximum lateness. We show that the case where the jobs have deadlines is strongly NP-hard. We develop a polynomial-time approximation scheme for the problem to minimize the maximum delivery completion time, which is equivalent to minimizing the maximum lateness from the optimization viewpoint.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call