Abstract

We consider the NP-hard problem of scheduling jobs on a single machine about an unrestricted due date to minimize total weighted earliness and tardiness cost. Jobs are grouped into families where jobs in the same family share a setup; a setup time is required between the processing of two jobs from different families. Each job has an earliness penalty rate and a tardiness penalty rate that are allowed to be arbitrary. These rates are assessed on a per-period basis when the completion time deviates from its due date. In this paper, we generalize properties from the literature that characterize the structure of an optimal schedule, present a lower bound, propose a branch and bound algorithm and a beam search procedure, and report results from a computational experiment. We find that optimal solutions can be quickly obtained for smaller problem instances. For large problems, we find high quality solutions within a few minutes of CPU time.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.