Abstract

This paper addresses a production scheduling problem in an injection molding facility. It appears to be the first attempt to schedule parallel machines for multiple items in presence of multiple capacitated resource constraints with sequence-dependent setup costs and times. The objective is to meet customer demands while minimizing the total inventory holding costs, backlogging costs and setup costs. We present a mathematical formulation of the problem. The computational complexity associated with the formulation makes it difficult for standard solvers address industrial-dimensioned problems in reasonable solution time. To overcome this, a two-phase workcenter-based decomposition scheme has been developed in this paper. The computational results for different problem sizes demonstrate that this scheme is able to solve industrial-dimensioned problems within reasonable time and accuracy.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.