Abstract

In this paper, we consider the scheduling of high multiplicity jobs on parallel multi-purpose machines with setup times and machine available times, with the objective of minimizing makespan. High multiplicity means that jobs are partitioned into several groups and in each group all jobs are identical. Whenever there is a switch from processing a job of one group to a job of another group, a setup time is needed. Multi-purpose machine implies that each job can only be processed by a specific subset of all the machines, called processing set. A mixed integer programming is formulated for this NP-hard problem. A heuristic is proposed to solve the problem. Lower bounds are developed to evaluate the heuristic algorithm. Extensive numerical computations are performed and the results show that the heuristic generates solutions with makespan within 2% above the lower bounds in average, and outperforms CPLEX 12.6 for large scale and complex problems.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.