Abstract
A heuristic scheduling approach is proposed for the concurrent product development processes, in which some crucial parameters are determined using the genetic algorithm (GA). Scheduling concurrent activities is of great significance to shorten development lead-time and minimize costs, since it can eliminate unnecessary redesign periods and guarantee that serial activities can be executed as concurrently as possible. To ensure the optimal concurrent scheduling and the effective utilization of resources along with efficient delivery of information, some key factors such as time order, information, resources, lead-time and overlapping time of activities, which enable concurrent activities to be executed successfully, are taken into account. Their weighting factors are fixed by the GA. In addition, the scheduling module includes role allocation and feedback revision. A simulation example, which is part of an aircraft product development process, shows the feasibility of the algorithm.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.