Abstract

This paper presents the salient aspects of the performance analysis of two mechanisms for shop floor control namely, order review/release (ORR) and dispatching rules in an assembly job shop system in a multi-objective environment. A simulation model of an assembly job shop is developed for experimentation with eight dispatching rules and four ORR mechanisms from the literature. An ORR policy based on the concept of backward scheduling and interval release is developed and incorporated in the simulation model. Grey relational analysis is used for ranking the ORR policy-dispatching rule combinations. Multivariate and univariate hypotheses are developed. The results are analysed using ANOVA and MANOVA. The analysis of results reveals that integrating dispatching rules with ORR policies provides better system performance than using dispatching rules alone. The proposed ORR policy namely, backward scheduling with interval release policy provides better results than other ORR polices.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.