Abstract
Aircraft ground handling is an integral part of airline operations. Although ground handling operations usually are straightforward, it could be very complicated in certain situations, such as troubling cargo loading and unloading incidents, weather conditions or improper use of equipment and breakdowns. Ground handlers need to orchestrate a number of activities within a confined area around airplane in a short period of time. Punctuality is important for airlines and resulting increased efficiencies. In this article, scheduling aircraft ground handling operations with uncertain durations using the critical path analysis and Monte Carlo simulation is considered with the aim of improving aircraft ground services during the turnaround. Having an accurate estimate of aircraft turnaround time considering its type and load, the recourses would be assigned to the ground operations more efficiently. A case study of a long-range wide-body twin-engine jet aircraft is discussed in detail. The results indicate that the proposed method gives improved scheduling relative to the routines observed at a hub airport.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: International Journal of Business Strategy and Automation
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.