Abstract
Purpose – Petrochemical projects play a very important role in the economic development of Vietnam. For the past ten years, many large-scale petrochemical plants have been developed using the engineering, procurement and construction (EPC) project delivery system for completing the project faster. However, many projects have suffered from schedule delays. In order to solve the delay problem, a clear understanding of the EPC business model and its delays problems are studied in this research. A qualitative research method by using case study on selected EPC projects was adopted. This paper aims to define the current business models used in the Vietnamese petrochemical industry and explores the root cause of delays. Design/methodology/approach – The research methodology used in this study is multiple case studies by purposive sampling on EPC projects. This is chosen due to the limited number of EPC projects in petrochemical in Vietnam and to obtain schedule delay factors from both delayed and on-time projects. In this purposive sampling, the researcher decided on what needs to know and sets out to find the people who can and are willing to share their information. From each project, project manager and project engineer were interviewed to understand the delay factors in their EPC projects. Data from the interview were analyzed by using “pattern coding” described by Miles and Huberman. Then, cross-case analysis was used to identify the common and unique factors occurring in each case. By comparing the three cases, the authors can identify the delay factors in EPC petrochemical in Vietnam. Findings – By interviewing the management level officers in three cases and performing exploratory work on the secondary data, it was observed that the local and foreign contractors of EPC projects in Vietnam have generally similar business process. Then, the codes were grounded based on the EPC business process, and subjected to the cross-case analysis. The root cause of problems in each phase was provided. Originality/value – The paper fulfills an identified root cause of EPC projects in Vietnam.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.