Abstract

This paper addresses a static, n-job, single-machine scheduling problem with sequence dependent family setups. The setup matrix follows a special structure where a constant setup is required only if a job from a smaller indexed family is an immediate successor of one from a larger indexed family. The objective is to minimize the maximum lateness (Lmax). A two-step neighborhood search procedure and an implicit enumeration scheme are proposed. Both procedures exploit the problem structure. The enumeration scheme produces optimum solutions to small and medium sized problems in reasonable computational times, yet it fails to perform efficiently in larger instances. Computational results show that the heuristic procedure is highly effective, and is efficient even for extremely large problems.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.