Abstract
Semiconductor wafer fabrication probably includes the most complex and constrained manufacturing processes due to its intricate and time-varying environment. This paper focuses on time constraint tunnels (TCTs), which can have a very high impact on the yield and reliability of final products. More precisely, the original problem faced by managers of controlling the release of multiple lots in a TCT is addressed in the context of a wafer facility operating in a High-Mix Medium-Volume manufacturing environment. To support the management of TCTs in an industrially acceptable context, a scheduling-based sampling method is proposed to estimate the probability that multiple lots released at the entrance of a given TCT leave this TCT on time. In order to investigate the industrial viability and identify the limitations of the probability-estimation approach, numerical experiments are conducted on real-life data and analyzed through the prism of several relevant performance criteria. Insights gathered from this numerical analysis are then used to discuss the specific management requirements that stem from the criticality of TCTs in semiconductor manufacturing facilities.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.