Abstract

The operator is always present in the main control room (MCR) of a nuclear power plant. However, when a fire occurs in an MCR, different conditions for operator habitability are proposed using various criteria, and various evacuation safety evaluation results can be obtained. In this study, fire and evacuation simulations of an MCR were performed to determine the available safe egress time and required safe egress time. In addition, the evacuation safety and habitability of the MCR were evaluated for various criteria.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call