Abstract

xes to runways, and taxi costs from runways to gates. This paper also includes details of mathematical formulations and the computation method of emissions. At the end of the paper, we provide a numerical example for planning landings and takeos at the Detroit international airport. The optimization results show that ight delays reduce as much as 44.7%, much greater than the runway sequence without runway assignment. Meanwhile, the emissions of optimal solution reduce as much as 25.4%. The proposed model for strategically planning terminal airspace operations is benecial to improve airport eciency and local environments.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.