Abstract

In the article it is recommended to utilize simple means of mechanization as well as to execute some operations manually, bearing in mind that for roofing arrangement one engages small enterprises participating in construction of low-rise buildings, their current and capital repairs on operated industrial and civil objects. Structure of technological operations: base and slopes flatness control from watersheds to drain funnels; surface defects elimination; contaminants removal. Herewith, it is recommended to use domestic and foreign tools and implements: hammer; boaster; chisel; steel brush; watering can; mortar blade; mortar supplying bucket; water and mortar dip-buckets; three-meter control rail; level; folding meter or tape measure; safety glasses. In the article, as a result, it is ascertained the rational methods of soft roofing arrangement (based on labor intensity measurements in labs) and gained optimal organizational and technological solutions allowing to carry out processes taking into account work safety for workers.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.