Abstract
Objectives: The key objective of this present article is the presentation of a control strategy which consists to compensate the disturbance as soon as it is observed. The main purpose of the proposed control strategy is to guarantee the respect of railway scheduling. The novel strategy allows compensating temporal disruption as soon as it is observed in order to avoid the time constraint violation and to respect planned scheduling. Methods: An algorithm that amends the measured disturbances by compensating the disruption along the mono-synchronized paths is presented. The proposed algorithm allows computing the available control margin for every controllable place. Findings: The main impartial is to compensate partially or totally the disturbance so as to avoid time constraint violation in railway transport networks. In these networks, time may be a significant parameter because it encompasses constraints to avoid adverse events. The temporal constraints which will arise on the railway network may degrade the planed schedules and consequently affect the availability of transportation systems. This leads to many problems in the decision and optimization of the studied transport systems. Novelty/Applications: This paper is devoted to the modeling and robust control of the Tunisian railway network. In this context, a novel robustness strategy is developed to compensate the time disruption in railway networks and to preserve the planned schedule. Keywords: robustness; control; temporal disturbances; railway networks; Ptime Petri Nets
Published Version (Free)
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have