Abstract

The paper describes the problem of control of multi-machine power systems under parametric uncertainties, perturbed mechanical input power and unknown variable communication time-delay. The algorithm is proposed for the case when only relative speeds of each electrical generator are measured. The algorithm synchronizes the multi-machine power system with the required accuracy in the normal mode and under symmetrical 3-phase short circuit faults which occur on transmission lines. Efficiency of the scheme is illustrated by modeling of the three machine power systems.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call