Abstract

The paper describes the robust control of multi-machine power systems under uncertainties and constant communication time-delay. We assume that only relative speeds of each generator are available for measurement. The proposed algorithm ensures the synchronization of the multi-machine power system with the required accuracy in the normal mode and symmetrical 3-phase short circuit faults which occur on transmission lines.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call