Abstract

The concept of supply chain in construction is very influential on the improvement of projects performance. In outlining the problems in the supply chain, it need to be identified the risks therein related to the smoothness of the supply chain process. Risk is an event / uncertainty condition, when it happens may lead to positive or negative impact [1]. The purpose of this study are to determine the identification of risks on supply chain in construction projects, analyze the risks, and analyze the response of risks. Primary data obtained through a questionnaire and interview methods. Data processing method that used in this research were Promethee method for risk analysis, and descriptive statistical methods at risk response. From this research, it is known that the identification of risks at supply chain in construction projects can be seen from the potential failure of achievement of Key Performance Indicators in Supply Chain Management (SCM). From risk analysis with Promethee method, it is known that the highest risk in SCM is the change of price from sub-contractors. Based on the analysis for risk response, it is known that the contractor has developed mitigation measures to risk response.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.