Abstract

This paper shows a project risk management system model allowing to better identify risks and to manage them throughout the life cycle of the project. It shows the most popular methods of risk probability assessment and tries to indicate the advantages of the robust approach over the traditional methods. Modern development of project management as well as the accumulated knowledge and experience in this field made it possible to integrate project management knowledge into a single system model. Within the framework of this model standard and robust approaches are applied and expanded for the tasks of project data analysis. The suggested algorithms used to assess the parameters in statistical models allow to obtain reliable estimates.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.